12 Cabins, Sited in 20 Seconds for $0.00
We screened 15,735 parcels in El Dorado County, California, eliminated all but five, and sited 12 cabins on one 18.98-acre parcel in 20.1 seconds. Paid data spend: $0.00.
A Perplexity demo of the same land-siting task used 31 requests and $2.20. Our run used 65 public-source calls. The difference is not the model. It is that the pipeline reads parcel geometry, flood zones, wetlands, protected land and 1 m elevation instead of describing them.
The 36-second film above is the receipt. On a phone? The vertical cut fills the screen.
And this is the result itself: the chosen parcel, flown in the world we built from its real aerial and terrain.
The run
15,735 parcels in the study area, narrowed to 2,885 by size and 290 vacant
| Stage | Parcels |
|---|---|
| In the study area (El Dorado Hills / Cameron Park / Shingle Springs) | 15,735 |
| Between 5 and 120 acres | 2,885 |
| Vacant (no dwelling unit) | 290 |
| Killed by FEMA flood zone (Zone A/AE) | 3 |
| Killed by USFWS wetland | 101 |
| Killed by PAD-US protected land | 20 |
| Killed by slope at 10 m (p90 >= 15%) | 111 |
| Killed by slope at 1 m (p90 >= 15%) | 33 |
| Passed every layer | 22 |
| Finalists | 5 |
| Cabins sited on the best finalist | 12 |
The five finalists ranked by buildable acres, size fit, road address and slope
APN 102580016 on USGS NAIP aerial with the 12 cabin pads, every pad under 15% slope
The chosen site is APN 102580016: 18.98 acres, 17.22 buildable acres, p90 slope 14.6%, 12 pads all under 15%. Every excluded parcel carries the layer and the value that killed it: Zone A, a named wetland type, a PAD-US unit, or a slope percentile.
The mechanism
The parcel fabric comes from the County of El Dorado's public parcel service. Flood comes from FEMA's National Flood Hazard Layer, wetlands from the USFWS National Wetlands Inventory, and protected land from the USGS Protected Areas Database.
Slope is the part most demos skip. We pull a 10 m USGS 3DEP DEM for the whole study area, compute Horn slope inside each parcel polygon, and kill parcels whose 90th percentile slope is at or above 15% or whose buildable fraction is below half. The survivors get a second pass on the 1 m 3DEP DEM. That second pass removed 33 parcels the coarse screen would have let through.
The finalists are ranked by buildable acres, size fit, road address and slope quality. The best site gets a greedy pad layout: an 8 m candidate grid, slope under 12%, spacing at least 24 m, and twelve pads chosen low-slope first.
The world, not a box
All five finalists were built as DarkMatter worlds from the real sources: USGS NAIP aerial draped on the USGS 3DEP terrain mesh, with the NOAA sun for 10:00 local. Build times were 24 s, 144 s, 112 s, 128 s and 104 s. The top site's world rendered the 8-second fly-in near the top of this post straight from the pack; the QC stills passed the luminance tests.
One source was unreachable: every OpenStreetMap Overpass mirror timed out, so the worlds carry NAIP on 3DEP terrain and the NOAA sun without OSM buildings; we did not substitute a commercial basemap whose terms forbid derived textures. ShadowBroker's board was in maintenance and Mireye had no resolvable key, so the run used public parcel sources and kept paid spend at zero.
The film is code
The 4K60 master and the 9:16 cut were rendered by code a coding agent wrote. The scene is a pure function of time: parcel line art, elimination counts, the site aerial, the 12 pads, the DarkMatter terrain. No model filmed this. No footage was generated. We checked a frame every five seconds before delivery.
That distinction matters. "An AI created a 4K video" is the wrong sentence. A coding agent wrote the renderer; the renderer drew the film from measured data.
What this proves
Same task, different depth. A search-first demo can describe a site. A pipeline can eliminate 15,730 parcels, verify slope at one metre, place twelve pads, build the terrain and render the receipt. Ours did it in 20 seconds for $0.00. The film is the evidence, and the code is the method.
The demo is reproducible: one script, cached public sources, every call logged with status, bytes, seconds and cost. No paid API. No key required.
Same task, measured: 15,735 parcels in, 5 finalists out, $0.00 spent, 0.18 min wall clock
Keep the journal free
Sponsorship pays for the compute, the hardware and the hours behind these entries.
by email
New journal entries, in your inbox.
What the agents built, broke and fixed. One message per entry.